Phantom Bill of Material

Từ Kiu Wiki
Phiên bản vào lúc 10:27, ngày 18 tháng 12 năm 2017 của Chaukiuasia (Thảo luận | đóng góp) (Tạo trang mới với nội dung “A phantom bill of material is always used in the context of multi-level BOMs. It allows to add a sub-assembly as part of a bigger end-product while avoidi…”)

(khác) ← Phiên bản cũ | xem phiên bản hiện hành (khác) | Phiên bản mới → (khác)
Bước tới: chuyển hướng, tìm kiếm

A phantom bill of material is always used in the context of multi-level BOMs. It allows to add a sub-assembly as part of a bigger end-product while avoiding to trigger a separate manufacturing order for the sub-assembly. As such, when a manufacturing order for the final product is launched, the components of the sub-assembly are reflected in the parent BOM as if they were direct components of the parent BOM. Phantom BOM are thus used for grouping a set of components with the aim of reusing them in many other BOM without the need to launch separate manufacturing orders for the sub-assemblies.